What's under a Venice driveway
The American Bottom here is deep river-laid clay, silt, sand and gravel, kept dry by a levee and drainage canal system. Flat ground with water close to the surface drains slowly, and freeze-thaw winters lift pavement built on a wet base. We remove soft soil, compact rock in layers and grade so water leaves the surface.
Before you sign anything, get the base depth and the compacted asphalt thickness on paper. Two bids that look far apart are often just two different pavements.
Compacted asphaltTypically 2 to 3 in. for a car drive
Stone baseTypically 4 to 8 in., compacted
Drive on itUsually 2 to 3 days, longer in heat
First sealcoatTypically 6 to 12 months after paving
Typical ranges. Your Venice estimate is sized to the soil, the traffic and the drainage on your property.