Built for St. Clement's ground
Rolling farmland drains better than the flat spots that hold water after a storm, and the knob country east of here sheds it fast. Either way, freeze-thaw winters find whatever moisture is trapped under the pavement. We grade for runoff, pull out soft soil, and compact rock in layers before any asphalt goes down.
A cheap bid usually gets cheap somewhere you cannot see. Ask what depth of stone goes down, how thick the asphalt is after rolling, and who fixes it if water still stands.
Compacted asphaltTypically 2 to 3 in. for a car drive
Stone baseTypically 4 to 8 in., compacted
Drive on itUsually 2 to 3 days, longer in heat
First sealcoatTypically 6 to 12 months after paving
Typical ranges. Your St. Clement estimate is sized to the soil, the traffic and the drainage on your property.