Ground, water and winter in Pierron
The west end of the village drains toward Sugar Creek and the east end toward Shoal Creek, both headed for the Kaskaskia River. Ground near creek bottoms stays soft longer after rain, and clay soils common here move with moisture and freeze-thaw. We remove soft material, compact in lifts, and grade water off the surface.
The part of the job you can see is the last two inches. Ask what is underneath, how it will be compacted, and which way the finished surface drains.
Compacted asphaltTypically 2 to 3 in. for a car drive
Stone baseTypically 4 to 8 in., compacted
Drive on itUsually 2 to 3 days, longer in heat
First sealcoatTypically 6 to 12 months after paving
Typical ranges. Your Pierron estimate is sized to the soil, the traffic and the drainage on your property.