1. Home
  2. Service Areas
  3. St. Francois County
  4. Leadwood, MO

Asphalt paving in Leadwood, MO

Driveway and parking lot paving in Leadwood, along Highway 8 and the streets of the old company town, with free estimates.

Free estimates25% off

Map: Leadwood, MO in St. Francois County, 57 miles south-southwest of downtown St. Louis MISSISSIPPIMISSOURIMERAMEC LeadwoodSt. LouisFrankclayWorthamTerre du LacDesloge
Leadwood · St. Francois County57 mi south
CountySt. Francois County
ZIP codes63653
From downtown St. Louis57 miles south-southwest
Population (2024 est.)1,155

Main routes: Highway 8, Highway A, and Highway M

Blacktop that holds up in Leadwood

Built in 1906 as a St. Joe Lead company town, first called Owl Creek, laid out along the St. Louis, Iron Mountain and Southern Railway. Company-town streets are tight and regular, with short drives and small yards. Driveways are the everyday work here, plus parking lots for churches, shops and civic buildings.

Highway 8 runs through, with Highway A and Highway M feeding in from the countryside, so the jobs range from a two-car drive in town to a long lane out on acreage. We handle the base, the drainage and the edges in either case. Residential asphalt is typically 2 to 3 inches compacted. Call (866) 490-7680 for a free estimate, and you get 25% off.

Freshly paved black asphalt driveway with a side parking extension leading to a brick ranch home's two-car garage

Driveway paving in Leadwood

In an old mining town the drives are short, close to the neighbors and often sitting on whatever base was there in the 1950s. We dig into that before quoting. Soft ground comes out, rock goes in and gets compacted in layers, then hot mix, typically 2 to 3 inches compacted for cars and pickups. Edges get built up where there is no curb to hold them.

Driveway paving

Parking lot paving in Leadwood

Churches, city buildings, shops and small industrial pads here need lots that take pickups and delivery trucks. We size the base to that load, slope the surface so water leaves instead of ponding at a door, then lay asphalt in lifts. Millings over a prepared base are a practical surface for a yard or an equipment area.

Parking lot paving

Road construction & private roads

Alleys, private drives and gravel lanes running out toward the farms and the old mine ground are steady work in this county. We grade, build a compacted rock base, crown the surface and finish in asphalt or chip seal to match the traffic. Culverts and ditching go in wherever water crosses the lane.

Road construction

General asphalt paving & repair

In a town like Leadwood, general asphalt work covers a lot of ground: shop and church lots, alley aprons, repairs along a curb line, overlays on older streets and pads for equipment. The approach stays the same: fix the base, lay the hot mix, roll it tight, finish the edges.

Asphalt paving
Asphalt paver loaded with hot mix paving over a white gravel country driveway under shade trees
Asphalt paver loaded with hot mix paving over a white gravel country driveway under shade trees

Also available in Leadwood

What's under a Leadwood driveway

The Big River drains the north part of St. Francois County, and the hills here carry red cherty clay with thin soils over rock on the knobs. NRCS notes low strength for vehicle traffic on several county soils, correctable with suitable base material. Add freeze-thaw winters and drainage becomes the first decision on every job.

When you compare bids, ask each contractor for three numbers in writing: the compacted asphalt thickness, the base depth, and what happens to the water. Those three decide how long the surface lasts.

Compacted asphaltTypically 2 to 3 in. for a car drive
Stone baseTypically 4 to 8 in., compacted
Drive on itUsually 2 to 3 days, longer in heat
First sealcoatTypically 6 to 12 months after paving

Typical ranges. Your Leadwood estimate is sized to the soil, the traffic and the drainage on your property.

Cross-section of an asphalt driveway From top to bottom: compacted hot-mix asphalt surface, compacted crushed-stone base, and prepared subgrade soil, with the surface sloped so water runs off. Slope sheds water Hot-mix asphalt 2 to 3 in., rolled hot Crushed-stone base Subgrade, soft spots dug out Typical driveway, not to scale
New asphalt driveway climbing a grassy hillside from a gravel road to a detached two-car garage
New asphalt driveway climbing a grassy hillside from a gravel road to a detached two-car garage

Leadwood paving questions

Straight answers for Leadwood homeowners and property managers. Anything else, call (866) 490-7680.

Can you pave over an old gravel drive?

Yes, but not straight over it. Gravel that has rutted or gone soft needs grading and fresh compacted rock first, or the new asphalt will mirror every low spot within a year. We check the existing base depth during the free estimate and price what it actually needs.

Do you take small jobs, like a single parking pad?

Yes. A single pad, a short approach or a patch on an existing drive is normal work. Small jobs get the same subgrade prep and compaction as large ones, because that is what determines how long they last. Estimates are free and you get 25% off.

What kind of base should go under a Leadwood driveway?

Typically a compacted crushed-stone base several inches deep on firm soil, with soft spots dug out first, and that holds for any Leadwood driveway. On clay soils that hold water, a thicker base and good slope matter even more. The estimate states the base depth so there are no surprises.

Will a new surface fix water standing in my lot?

Only if the grade changes. Paving over a low spot in Leadwood leaves the same low spot in a smoother surface. We measure the fall first and tell you what it takes to move the water.

Nearby towns we pave

We pave all around Leadwood, across St. Francois County and the rest of greater St. Louis on both sides of the river.

All 15 St. Francois County communities

Every town we serve

TownCountyMiles from Leadwood
Frankclay, MOSt. Francois County1.4
Wortham, MOSt. Francois County1.7
Terre du Lac, MOSt. Francois County3.3
Desloge, MOSt. Francois County3.9
Irondale, MOWashington County4.7
Bonne Terre, MOSt. Francois County4.8
Park Hills, MOSt. Francois County5.8
Leadington, MOSt. Francois County6.2
Bismarck, MOSt. Francois County6.8
Mineral Point, MOWashington County9.4

Let's look at your Leadwood job

Free on-site estimates and 25% off. Driveways, parking lots and private roads in Leadwood and the towns around it.

Free estimate in Leadwood

Tell us what you want paved and where. We'll call to set up a time to walk the site, measure, and give you a written quote with your 25% off.

  1. Send the form or call. We reply to set a time.
  2. We walk the site, measure and talk through options.
  3. You get a quote with your 25% off, and straight answers on base, thickness and drainage.
Rather talk now?(866) 490-7680

We only use your details to contact you about this project (privacy policy). This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.