Why the base matters in Butler
Water from the village runs east to Cress Creek and west to Brush Creek, both feeding forks of Shoal Creek. Slow-draining soils are common in this part of Illinois, and trapped water turns into frost damage every winter. We check where water goes before paving, build on firm ground, and grade every surface to shed rain.
Bids are only comparable when they spell out the same things: base depth, compacted thickness, how edges are finished, and where water is meant to go. Ask for those before you pick a number.
Compacted asphaltTypically 2 to 3 in. for a car drive
Stone baseTypically 4 to 8 in., compacted
Drive on itUsually 2 to 3 days, longer in heat
First sealcoatTypically 6 to 12 months after paving
Typical ranges. Your Butler estimate is sized to the soil, the traffic and the drainage on your property.