Built for South Jacksonville's ground
Mauvaise Terre Creek runs north through the east side of the village and on through the lake, so ground on that side sits lower and drains toward the creek. Silt and clay soils common here hold water and move with freeze-thaw. We proof the subgrade, compact base rock in lifts, and build slope into every surface.
A cheap bid usually gets cheap somewhere you cannot see. Ask what depth of stone goes down, how thick the asphalt is after rolling, and who fixes it if water still stands.
Compacted asphaltTypically 2 to 3 in. for a car drive
Stone baseTypically 4 to 8 in., compacted
Drive on itUsually 2 to 3 days, longer in heat
First sealcoatTypically 6 to 12 months after paving
Typical ranges. Your South Jacksonville estimate is sized to the soil, the traffic and the drainage on your property.