Ground, water and winter in Lithium
Eastern Perry County is the Perryville Karst, where caves, sinkholes, springs and losing streams tie surface runoff straight to shallow groundwater. Ground like that moves water in ways you cannot always see. We look at where runoff goes, keep it off the subgrade, and compact the rock base in layers before paving.
Bids are only comparable when they spell out the same things: base depth, compacted thickness, how edges are finished, and where water is meant to go. Ask for those before you pick a number.
Compacted asphaltTypically 2 to 3 in. for a car drive
Stone baseTypically 4 to 8 in., compacted
Drive on itUsually 2 to 3 days, longer in heat
First sealcoatTypically 6 to 12 months after paving
Typical ranges. Your Lithium estimate is sized to the soil, the traffic and the drainage on your property.