Ground, water and winter in Leslie
Franklin County sits at the northern edge of the Ozarks, with cherty red clay over cherty dolomite common across the Salem Plateau and karst caves, springs and sinkholes in the bedrock. Water that gets under a pavement is what breaks it, and freeze-thaw winters speed that up. We drain first, then compact base in layers.
Bids are only comparable when they spell out the same things: base depth, compacted thickness, how edges are finished, and where water is meant to go. Ask for those before you pick a number.
Compacted asphaltTypically 2 to 3 in. for a car drive
Stone baseTypically 4 to 8 in., compacted
Drive on itUsually 2 to 3 days, longer in heat
First sealcoatTypically 6 to 12 months after paving
Typical ranges. Your Leslie estimate is sized to the soil, the traffic and the drainage on your property.