Why the base matters in Hecker
Upland soil here is silt-heavy and slow to drain. Monroe County also holds thousands of sinkholes through its northern and western parts, so ground conditions are worth checking rather than assuming. We grade for runoff, pull out material that will not hold and compact the base in layers, which gives freeze-thaw far less water to work with.
When you compare bids, ask each contractor for three numbers in writing: the compacted asphalt thickness, the base depth, and what happens to the water. Those three decide how long the surface lasts.
Compacted asphaltTypically 2 to 3 in. for a car drive
Stone baseTypically 4 to 8 in., compacted
Drive on itUsually 2 to 3 days, longer in heat
First sealcoatTypically 6 to 12 months after paving
Typical ranges. Your Hecker estimate is sized to the soil, the traffic and the drainage on your property.