What's under a Florence driveway
River bank ground holds water and shifts with the seasons, and clay-heavy soils common across the region make it slower to dry. Freeze-thaw winters then lift pavement built on a wet base. We plan the drainage, dig out soft material and compact clean rock in layers, because a dry base is what holds asphalt flat.
The part of the job you can see is the last two inches. Ask what is underneath, how it will be compacted, and which way the finished surface drains.
Compacted asphaltTypically 2 to 3 in. for a car drive
Stone baseTypically 4 to 8 in., compacted
Drive on itUsually 2 to 3 days, longer in heat
First sealcoatTypically 6 to 12 months after paving
Typical ranges. Your Florence estimate is sized to the soil, the traffic and the drainage on your property.